Technical Guidance Note 9: Garage Conversion

 Do I Need To Make An Application?

Yes. To convert a non habitable part of a building and to use it for habitable purposes will require an application under the Building Regulations. 

How Do I Make An Application? 

Having established that an application is required, you have the choice of adopting one of two procedures.

     
  • Full Plans
       
     
  • Building Notice

Full Plans: -

Two copies of the plan and two copies of the application form are required.

What Must The Plans Show?

The plans must show floor layout, sections through various parts of the alterations showing methods of construction etc. and elevations to show the changes.  A location plan (scale 1:2500 or 1:1250) will also be required.

The plans and accompanying details should show the following:

     
  • How the garage door is to be filled in, i.e. foundations, beams, lintels, wall construction, damp proof courses etc.
       
       
  • How the existing external walls will resist the passage of moisture if they are not already cavity construction.  Thermal insulation will also be required to the walls, floor and roof.
       
       
  • The window(s) has sufficient opening area to provide adequate rapid ventilation and background ventilation.  Sometimes windows also need to be suitable for means of escape in case of fire.
       
       
  • Details will be required for any new heat producing appliance, such as a gas fire.  Permanent ventilation may be required to some heating appliances.
       
       
  • Details will be required of the proposed floor (including a damp proof membrane), together with details of sub-floor ventilation if the floor is suspended.

Applications are normally checked within 10 working days of receipt.  You will be notified in writing of any queries the Council may have.

Building Notice

Two completed copies of the application form must be submitted, together with the appropriate fee. 48 hours after receipt of a commencement notice work may start on site.

Which Method Shall I Use?

For the advantages and disadvantages of either method please see Guidance Note 2 Building Notice Procedure.

How Much Will It Cost To Make An Application?

Whether you choose to deposit a Full Plans or Building Notice application the total fee payable will be the same.

A separate guidance note on Building Control fees is available, and can be obtained from the address below.

Please note that this guidance note relates to Building Regulation approval only.  You may also need Planning permission; details can be obtained from the Development Control Group Tel: (01903) 221353 / 221354.

If you wish to submit a Building Regulation application or have any doubts whatsoever, please do not hesitate to contact:

Building Control Group
Planning Section
Portland House
Richmond Road
Worthing
West Sussex
BN11 lLF

Tel: 01903 221344

E-mail: building.control@worthing.gov.uk

Minicom: 01903 204500

Fax: 01903 207365

Answerphone: 01903 214034

 

Back to Navigation - Back to the top of this article

E-mail and Share this Page Help me with this

Facebook, Twitter, Bebo and Google allow you to share this and other pages on the Internet with your friends, family, colleagues and other contacts. These websites are called Social Networking sites. The social part comes from the ability to share pages and information that interests you with your contacts. If you do not have an account with these services you may need to register the first time. You can also easily e-mail this page to someone you know by clicking the 'Email to a friend' option.

Find out more about social networks on Wikipedia.com

Hide this information

Copyright and Policy